1960

When We Started

From 1960-1980, there was 1.97 MW (Mega watt) energy generation.

1981

Upgradation

From 1981-2000, our generation was 52.88 MW (Mega watt).

2000

Recent Generation

From 2000-2021, our generation was 121.3 MW (Mega watt).

2022

Advance Generation Projects

We are working on different generation projects for better features.

Generation Stations

211(MW)

Total Installed Capacity

125(MW)

Hydel stations

35(MW)

Thermal stations

185(MW)

Hydel Capacity

26(MW)

Thermal Capacity

Generation Summary

District Total Installed Capacity Hydel (MW) Thermal (MW) Total (MW) Demand (MW) Shortfall (MW)
Gilgit 68.780 49.800 0.000 49.800 52.00 2.20
Ghizer 20.470 14.81 0.000 14.810 17.59 2.78
Hunza 7.780 4.71 0.800 5.510 13.50 7.99
Nagar 7.200 5.54 0.000 5.540 7.00 1.46
Skardu 36.000 19.82 0.000 19.820 25.00 10.30
Shiger 5.600 3.6 0.000 3.600 5.00 5.00
Kharmong 11.480 7.01 0.000 7.010 6.00 -1.01
Ghanche 12.840 8.09 0.000 8.090 15.00 6.91
Diamer 23.100 12.09 0.800 12.890 21.30 7.04
Astore 8.960 6.18 0.000 6.180 10.00 3.82
Total 202.210 131.650 1.600 133.250 172.39 42.89